Residential Permits
Adding, redoing any MEP's to a project may require a plan review. Permits may require contractor registration, drawn-to-scale plan(s), and site plan, engineered foundation plan, utility locates, utility disconnection/re-connection, and inspections.
Fee Schedule
|
Permits |
Price |
|
Base Fee (Administrative) |
$40.00 |
|
Plan Review |
$150.00 |
|
Lot Review |
$75.00 |
|
Demolition deposit (refundable) |
$100.00 |
|
Demolition permit (non-refundable) |
$80.00 |
|
Moving permit |
$100.00 |
|
Shipping for plans submittal (to & from ATS) |
$20.00 |
|
Building |
$80.00 |
|
Plumbing & Backflow preventer |
$80.00 |
|
Electrical |
$80.00 |
|
Mechanical (A/C & Heating) |
$80.00 |
|
Gas Permit |
$80.00 |
|
Driveway-Concrete-plus per sq ft/ no inspections |
$80.00 |
|
Deck plus per sq ft/ insp extra |
$80.00 |
|
Patio/ Porch plus per sq ft/ insp extra |
$80.00 |
|
Pergola plus per sq ft/ insp extra |
$80.00 |
|
Greenhouse plus per sq ft/ insp extra |
$80.00 |
|
Storage building plus per sq ft/ insp extra |
$80.00 |
|
Carport/ garage plus per sq ft/ insp extra |
$80.00 |
|
Fence |
$80.00 |
|
Roof permit fee / insp extra |
$80.00 |
|
Solar panels permit fee / insp extra |
$80.00 |
|
Water heater permit fee / insp extra |
$80.00 |
|
Water softener permit fee / insp extra |
$80.00 |
|
Pool -inground- |
|
|
Inspections |
Price |
|
T-pole-Temporary electric service |
$80.00 |
|
Plumbing-rough (first) |
$80.00 |
|
Copper rough-ins (second) |
$80.00 |
|
Combination (frame, MEP rough-in mechanical, elec. & plumbing-top-out) |
$80.00 |
|
Electrical-rough |
$80.00 |
|
Electrical service |
$80.00 |
|
Mechanical-rough |
$80.00 |
|
Mechanical-final |
$80.00 |
|
Gas test & Electrical service |
$80.00 |
|
Foundation |
$80.00 |
|
Water & Sewer lines |
$80.00 |
|
Re-Frame & Insulation |
$80.00 |
|
Remodeling/ Alteration to existing structure |
$80.00 |
|
Wallboard (sheetrock) |
$80.00 |
|
Finals combination – Certificate of Occupancy (Electrical, Plumbing, Mechanical, Gas, & Building Finals) |
$80.00 |
|
Roof inspection |
$80.00 |
|
Backflow prevention inspection |
$80.00 |
|
Re-Inspection |
$80.00 |
|
|
|
|
Grand total (not including Re-Inspection) |
$3,285.00 |
|
Other Fees |
Price |
|
Administrative (.20/sq ft price) or base fee |
$0.20/sq ft or base fee |
|
Administrative – base price |
$40.00 |
|
|
|
|
FOR SUBDIVISIONS |
RESIDENTIAL |
|
see Development Guide |
|
|
TYPE OF PLAN SUBMITTAL |
FEES |
|
New building plan |
$100.00 + 0.10/sq ft |
|
New building – Shell only |
$100.00 + 0.05/sq ft |
|
New building – Finish out |
$100.00 + 0.05/sq ft |
|
Existing building re-model |
$100.00 |
|
Fire Alarm Plan |
$100.00 |
|
Hood System |
$100.00 |